Go back to article: A long engagement – railways, data and the information age
Figure 10

© Robert Gwynne / Network Rail
Total Operations Processing System (TOPS), which went live in 1975, running in a Network Rail ‘Rail Operations Centre’ in 2019
Go back to article: A long engagement – railways, data and the information age
© Robert Gwynne / Network Rail
Total Operations Processing System (TOPS), which went live in 1975, running in a Network Rail ‘Rail Operations Centre’ in 2019